In the beginning, the Jai Hind metro station was planned being elevated. Nonetheless, the AAI objected which the elevated stretch up on the airport could possibly pose a danger to plane, so the route was even further reworked along with the station was shifted underground, 150 m from the Airport terminal https://railway-recruitment03467.jiliblog.com/90037023/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf