Project Highlight Newsome has successfully delivered the installation and commissioning of a modern 400 kW chiller at a major confectionery manufacturing site in York. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://getidealist.com/story22581177/advanced-400-kw-chiller-installation-achieves-50k-annual-energy-savings-and-200-metric-tonnes-co%E2%82%82-cut